All files / quinary-loop-interchange-order/lib main.js

87.85% Statements 94/107
100% Branches 1/1
0% Functions 0/1
87.85% Lines 94/107

Press n or j to go to the next uncovered block, b, p or k for the previous block.

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80 81 82 83 84 85 86 87 88 89 90 91 92 93 94 95 96 97 98 99 100 101 102 103 104 105 106 107 1081x 1x 1x 1x 1x 1x 1x 1x 1x 1x 1x 1x 1x 1x 1x 1x 1x 1x 1x 1x 1x 1x 1x 1x 1x 1x 1x 1x 1x 1x 1x 1x 1x 1x 1x 1x 1x 1x 1x 1x 1x 1x 1x 1x 1x 1x 1x 1x 1x 1x 1x 1x 1x 1x 1x 1x 1x 1x 1x 1x 1x 1x 1x 1x 1x 1x 1x 1x 1x 1x 1x 1x 1x 1x 1x 1x 1x 1x 1x 1x 1x 1x 1x 1x 1x 1x 1x 1x 1x                           1x 1x 1x 1x 1x  
/**
* @license Apache-2.0
*
* Copyright (c) 2026 The Stdlib Authors.
*
* Licensed under the Apache License, Version 2.0 (the "License");
* you may not use this file except in compliance with the License.
* You may obtain a copy of the License at
*
*    http://www.apache.org/licenses/LICENSE-2.0
*
* Unless required by applicable law or agreed to in writing, software
* distributed under the License is distributed on an "AS IS" BASIS,
* WITHOUT WARRANTIES OR CONDITIONS OF ANY KIND, either express or implied.
* See the License for the specific language governing permissions and
* limitations under the License.
*/
 
'use strict';
 
// MODULES //
 
var loopOrder = require( '@stdlib/ndarray/base/loop-interchange-order' );
 
 
// MAIN //
 
/**
* Reorders ndarray dimensions and associated strides for loop interchange.
*
* ## Notes
*
* -   The returned object has the following properties:
*
*     -   **sh**: dimensions sorted in loop order.
*     -   **sx**: first input ndarray strides sorted in loop order.
*     -   **sy**: second input ndarray strides sorted in loop order.
*     -   **sz**: third input ndarray strides sorted in loop order.
*     -   **sw**: fourth input ndarray strides sorted in loop order.
*     -   **su**: fifth input ndarray strides sorted in loop order.
*     -   **sv**: output ndarray strides sorted in loop order.
*     -   **idx**: dimension indices sorted in loop order.
*
* @param {NonNegativeIntegerArray} sh - array dimensions
* @param {IntegerArray} sx - first input array stride lengths
* @param {IntegerArray} sy - second input array stride lengths
* @param {IntegerArray} sz - third input array stride lengths
* @param {IntegerArray} sw - fourth input array stride lengths
* @param {IntegerArray} su - fifth input array stride lengths
* @param {IntegerArray} sv - output array stride lengths
* @returns {Object} loop interchange data
*
* @example
* var sh = [ 2, 3, 4 ];
*
* var sx = [ 12, 4, 1 ]; // row-major
* var sy = [ 24, 8, 1 ]; // row-major
* var sz = [ 12, 4, 1 ]; // row-major
* var sw = [ 24, 8, 1 ]; // row-major
* var su = [ 1, 4, 12 ]; // column-major
* var sv = [ 1, -2, 6 ]; // column-major
*
* var o = quinaryLoopOrder( sh, sx, sy, sz, sw, su, sv );
* // returns {...}
*
* var ssh = o.sh;
* // returns [ 4, 3, 2 ]
*
* var ssx = o.sx;
* // returns [ 1, 4, 12 ]
*
* var ssy = o.sy;
* // returns [ 1, 8, 24 ]
*
* var ssz = o.sz;
* // returns [ 1, 4, 12 ]
*
* var ssw = o.sw;
* // returns [ 1, 8, 24 ]
*
* var ssu = o.su;
* // returns [ 12, 4, 1 ]
*
* var ssv = o.sv;
* // returns [ 6, -2, 1 ]
*
* var idx = o.idx;
* // returns [ 2, 1, 0 ]
*/
function quinaryLoopOrder( sh, sx, sy, sz, sw, su, sv ) {
	var tmp = loopOrder( sh, [ sx, sy, sz, sw, su, sv ] );
	return {
		'sh': tmp[ 0 ],
		'sx': tmp[ 1 ],
		'sy': tmp[ 2 ],
		'sz': tmp[ 3 ],
		'sw': tmp[ 4 ],
		'su': tmp[ 5 ],
		'sv': tmp[ 6 ],
		'idx': tmp[ 7 ]
	};
}
 
 
// EXPORTS //
 
module.exports = quinaryLoopOrder;