All files loop-interchange-order/lib

63.87% Statements 198/310
100% Branches 3/3
0% Functions 0/2
63.87% Lines 198/310

Press n or j to go to the next uncovered block, b, p or k for the previous block.

File Statements Branches Functions Lines
index.js
100% 61/61 100% 1/1 100% 0/0 100% 61/61
main.js
54.3% 82/151 100% 1/1 0% 0/1 54.3% 82/151
sort2ins.js
56.12% 55/98 100% 1/1 0% 0/1 56.12% 55/98