All files / base/nullary-loop-interchange-order/lib main.js

77.9% Statements 67/86
100% Branches 1/1
0% Functions 0/1
77.9% Lines 67/86

Press n or j to go to the next uncovered block, b, p or k for the previous block.

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80 81 82 83 84 85 86 871x 1x 1x 1x 1x 1x 1x 1x 1x 1x 1x 1x 1x 1x 1x 1x 1x 1x 1x 1x 1x 1x 1x 1x 1x 1x 1x 1x 1x 1x 1x 1x 1x 1x 1x 1x 1x 1x 1x 1x 1x 1x 1x 1x 1x 1x 1x 1x 1x 1x 1x 1x 1x 1x 1x 1x 1x 1x 1x 1x 1x 1x                                       1x 1x 1x 1x 1x  
/**
* @license Apache-2.0
*
* Copyright (c) 2023 The Stdlib Authors.
*
* Licensed under the Apache License, Version 2.0 (the "License");
* you may not use this file except in compliance with the License.
* You may obtain a copy of the License at
*
*    http://www.apache.org/licenses/LICENSE-2.0
*
* Unless required by applicable law or agreed to in writing, software
* distributed under the License is distributed on an "AS IS" BASIS,
* WITHOUT WARRANTIES OR CONDITIONS OF ANY KIND, either express or implied.
* See the License for the specific language governing permissions and
* limitations under the License.
*/
 
'use strict';
 
// MODULES //
 
var zeroTo = require( '@stdlib/array/base/zero-to' );
var copy = require( '@stdlib/array/base/copy-indexed' );
var take = require( '@stdlib/array/base/take-indexed' );
var sort2ins = require( './sort2ins.js' );
 
 
// MAIN //
 
/**
* Reorders ndarray dimensions and associated strides for loop interchange.
*
* ## Notes
*
* -   The returned object has the following properties:
*
*     -   **sh**: dimensions sorted in loop order.
*     -   **sx**: ndarray strides sorted in loop order.
*     -   **idx**: dimension indices sorted in loop order.
*
* @param {NonNegativeIntegerArray} sh - array dimensions
* @param {IntegerArray} sx - array stride lengths
* @returns {Object} loop interchange data
*
* @example
* var sh = [ 2, 3, 4 ];
*
* var sx = [ 12, 4, 1 ]; // row-major
*
* var o = loopOrder( sh, sx );
* // returns {...}
*
* var ssh = o.sh;
* // returns [ 4, 3, 2 ]
*
* var ssx = o.sx;
* // returns [ 1, 4, 12 ]
*
* var idx = o.idx;
* // returns [ 2, 1, 0 ]
*/
function loopOrder( sh, sx ) {
	var idx;

	// Initialize a loop interchange index array for generating a loop order permutation:
	idx = zeroTo( sh.length );

	// Sort the array strides in increasing order (of magnitude):
	sx = copy( sx );
	sort2ins( sx, idx );

	// Permute the shape based on the sorted array strides:
	sh = take( sh, idx );

	return {
		'sh': sh,
		'sx': sx,
		'idx': idx
	};
}
 
 
// EXPORTS //
 
module.exports = loopOrder;