All files / base/nullary-loop-interchange-order/lib index.js

100% Statements 53/53
100% Branches 1/1
100% Functions 0/0
100% Lines 53/53

Press n or j to go to the next uncovered block, b, p or k for the previous block.

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 541x 1x 1x 1x 1x 1x 1x 1x 1x 1x 1x 1x 1x 1x 1x 1x 1x 1x 1x 1x 1x 1x 1x 1x 1x 1x 1x 1x 1x 1x 1x 1x 1x 1x 1x 1x 1x 1x 1x 1x 1x 1x 1x 1x 1x 1x 1x 1x 1x 1x 1x 1x 1x  
/**
* @license Apache-2.0
*
* Copyright (c) 2023 The Stdlib Authors.
*
* Licensed under the Apache License, Version 2.0 (the "License");
* you may not use this file except in compliance with the License.
* You may obtain a copy of the License at
*
*    http://www.apache.org/licenses/LICENSE-2.0
*
* Unless required by applicable law or agreed to in writing, software
* distributed under the License is distributed on an "AS IS" BASIS,
* WITHOUT WARRANTIES OR CONDITIONS OF ANY KIND, either express or implied.
* See the License for the specific language governing permissions and
* limitations under the License.
*/
 
'use strict';
 
/**
* Reorder ndarray dimensions and associated strides for loop interchange.
*
* @module @stdlib/ndarray/base/nullary-loop-interchange-order
*
* @example
* var nullaryLoopOrder = require( '@stdlib/ndarray/base/nullary-loop-interchange-order' );
*
* var sh = [ 2, 3, 4 ];
*
* var sx = [ 12, 4, 1 ]; // row-major
*
* var o = nullaryLoopOrder( sh, sx );
* // returns {...}
*
* var ssh = o.sh;
* // returns [ 4, 3, 2 ]
*
* var ssx = o.sx;
* // returns [ 1, 4, 12 ]
*
* var idx = o.idx;
* // returns [ 2, 1, 0 ]
*/
 
// MODULES //
 
var main = require( './main.js' );
 
 
// EXPORTS //
 
module.exports = main;