All files base/loop-interchange-order/lib

63.66% Statements 191/300
100% Branches 3/3
0% Functions 0/2
63.66% Lines 191/300

Press n or j to go to the next uncovered block, b, p or k for the previous block.

File Statements Branches Functions Lines
index.js
100% 58/58 100% 1/1 100% 0/0 100% 58/58
main.js
54.16% 78/144 100% 1/1 0% 0/1 54.16% 78/144
sort2ins.js
56.12% 55/98 100% 1/1 0% 0/1 56.12% 55/98