Press n or j to go to the next uncovered block, b, p or k for the previous block.
| File | Statements | Branches | Functions | Lines | |||||
|---|---|---|---|---|---|---|---|---|---|
| index.js |
|
100% | 57/57 | 100% | 1/1 | 100% | 0/0 | 100% | 57/57 |
| main.js |
|
77.65% | 73/94 | 100% | 1/1 | 0% | 0/1 | 77.65% | 73/94 |
| sort2ins.js |
|
56.12% | 55/98 | 100% | 1/1 | 0% | 0/1 | 56.12% | 55/98 |